19.5 meter trawler now being fitted out, shot blasting and zinc spraying in April.
Bodinnick ferry, waiting for slipping for it’s refit, both car ferries are being slipped in the same week.
The above has been in the yard having winches and hydraulics, full paint up, towing bollards, etc